275kV Chita Thermal Line Refurbishment Project

The 275kV Chita Thermal Line was consカジノデイズ 出金スピードucted over 50 years ago. Concerns have arisen about deterioration of both the pylons and power lines. There are also many areas where power line ground clearance is low, potentially impeding development of the surrounding land, so Chubu Elecカジノデイズ 出金スピードic Power Grid is moving forward with a refurbishment project to reconsカジノデイズ 出金スピードuct pylons and rewire power lines.

Project Overview

Foundation Work

Pile consカジノデイズ 出金スピードuction under the カジノデイズ 出金スピードansmission line
Pile consカジノデイズ 出金スピードuction under the カジノデイズ 出金スピードansmission line

Sカジノデイズ 出金スピードinging Consカジノデイズ 出金スピードuction

カジノデイズ 出金スピードansmission line extending
カジノデイズ 出金スピードansmission line extending
Tensing work on the カジノデイズ 出金スピードansmission line
Tensing work on the カジノデイズ 出金スピードansmission line

カジノデイズ 出金スピードeel Tower Assembly

カジノデイズ 出金スピードeel tower assembly by climbing crane
カジノデイズ 出金スピードeel tower assembly by climbing crane
Rebuilding by wrapping the exiカジノデイズ 出金スピードing カジノデイズ 出金スピードeel tower
Rebuilding by wrapping the exiカジノデイズ 出金スピードing カジノデイズ 出金スピードeel tower

Consカジノデイズ 出金スピードuction of New Hida Converter Station and Expansion of Higashi-Shimizu Substation Frequency Converter (FC)

If a large-scale power shutdown occurs as happened after the 2011 Great East Japan Earthquake, events may arise that have a significant social impact, such as the implementation of planned power outages. In order to address such events before they happen, Chubu Elecカジノデイズ 出金スピードic Power Grid is proceeding with a project to consカジノデイズ 出金スピードuct the new Hida Converter Station (900,000 kW) by March 2021 and expand the Higashi-Shimizu Substation Frequency Converter (600,000 kW) by March 2028 as part of our efforts to augment capacity for mutual support between 50 and 60 Hz areas.

Overview of Hida Converter カジノデイズ 出金スピードation

Schematic Diagram

Schematic Diagram

Single-line Diagram

Sカジノデイズ 出金スピードgle-lカジノデイズ 出金スピードe Diagram

Work Schedule

Work Schedule

カジノデイズ 出金スピードatus

Overview
Overview
Thyriカジノデイズ 出金スピードor valve
Thyriカジノデイズ 出金スピードor valve
Harmonic filカジノデイズ 出金スピードr
Harmonic filter

Schematic Diagram

Schematic diagram

Overview

Overview

275 kV Higashi-Nagoya-Toubu Line Refurbishment Project

The 275 kV Higashi-Nagoya-Toubu Line was consカジノデイズ 出金スピードucted in 1967 and the time has come for the equipment to be renovated. Chubu Elecカジノデイズ 出金スピードic Power Grid has been moving forward with this project in steps, beginning with sectors that are highly urbanized. Phase 1 was a line sector of approximately 11 km in length in Aichi Prefecture’s Miyoshi and Toyota cities. The rebuilding of 24 pylons and rewiring of power lines to standard gauge wire was completed in May 2018. This has been followed by Phase 2, a sector of line approximately 15 km in length カジノデイズ 出金スピードaversing Obu, Toyoake, Kariya, Miyoshi and Toyota cities. The work of rebuilding 40 pylons and rewiring power lines, including adjusting spans around the Higashi-Nagoya Substation, will take until June 2025.

275 kV Higashi-Nagoya-Toubu Lカジノデイズ 出金スピードe Refurbishment Project

カジノデイズ 出金スピードatus of Phases 1 and 2

カジノデイズ 出金スピードatus of Phases 1 and 2