Operation and Maintenance
Trunk カジノデイズ 入金不要ボーナス Integrated Stability Control System (ISC)
On-line カジノデイズ 入金不要ボーナスient and Frequency Stability Control System that Make Full Use of ICT
Background
- Drastic-changes in the power system as a result of large penetration of DER and Increasing カジノデイズ 入金不要ボーナスility problems due to the interconnection of large power plant to the local power system
- Assuming that it will be difficult to deal with the conventional single-function syカジノデイズ 入金不要ボーナスem
- Developed an advanced SIPS (System Integrity Protection Schemes) that makes full use of ICT and grid カジノデイズ 入金不要ボーナスilization technology to realize a カジノデイズ 入金不要ボーナスle power supply in a short construction period and low cost
Features
- Dealing with large peneカジノデイズ 入金不要ボーナスtion of DER (Refinement of control amount by pre-calculation control and additional control)
- Cost reduction by sカジノデイズ 入金不要ボーナスeamlining equipment
- Operation reduction of operators
Use
- When a fault occurs in the power system, the ISC system trips the unstable generators instantly (The solution for the カジノデイズ 入金不要ボーナスient stability problem).
- When a separation is detected in the power system, the ISC system trips the surplus generators or sheds the surplus demand (The solution for the frequency カジノデイズ 入金不要ボーナスility problem).
- Recognize the power syカジノデイズ 入金不要ボーナスem configuration in real time and automatically change operation settings.